Data Center design and realization
 
FULL REALIZATION
   
Main steps are :
  •  Requirements and specifications setting
 

•  Operation ability rate definition( Tier I to Tier IV)

  •  Analysis and technical choice proposal :
    Power
Air Conditionning
Fire detection and extinguishing
Securisation
   
Design et equipment installation layout
Equipment specifications
Realization management
Works : organization, steering and coordination
Flushing and operation tests
Equipment handover with inspection authority
Start up